Skip to content
Ø800 Gasketed Reinforced Concrete Pipe
Ø800

Gasketed Reinforced Concrete Pipes

Ø800 Gasketed Reinforced Concrete Pipe

The reinforced section gasketed, for loaded runs that also have to stay watertight.

Length
2000 mm
Wall
84 mm
Weight
1340 kg
Outer Ø
Ø968
Units / truck
11
Ask on WhatsApp

Technical advantages

Load capacity

The concrete section carries the backfill and traffic load above it for years.

Socket joint

Socket and spigot seat into one another, closing the joint along the line.

Fast installation

Standard lengths keep the line moving quickly and evenly on site.

Long service life

Buried concrete does not rust or deform; the line lasts for decades.

Main areas of use

Road infrastructure

Culverts and drainage under highways and city road crossings.

Waste and storm water

Sewer mains and storm water collection lines.

Urban renewal

Replacing existing infrastructure in redeveloped districts.

Irrigation and channels

Agricultural irrigation lines and stream rehabilitation works.

Contact

Let's talk about your next project.

Send your specification or quantity table; our team will respond shortly.