
Inspection Chamber Base
Ø1000 Inspection Chamber Base — Ø200 Inlet/Outlet
For chambers on Ø200 runs; the floor the chamber stands on comes cast in.
- Height
- 80 cm
- Wall
- 130 mm
- Weight
- 1375 kg
- Outer Ø
- 1260 mm
Technical advantages
Solid floor
The floor is cast solid at the plant, so no concrete is poured on site.
Formed openings
The pipe inlet and outlet are formed in the mould, so the piece arrives ready to connect.
Spigot joint
Each body seats over the collar of the one below, closing the joint cleanly.
Load capacity
The concrete section carries the backfill and traffic load above it for years.
Main areas of use
Waste and storm water
Sewer mains and storm water collection lines.
Road and street networks
Chambers on the sewer and storm lines that run under roads and streets.
Urban renewal
Replacing existing infrastructure in redeveloped districts.
Irrigation and channels
Agricultural irrigation lines and stream rehabilitation works.
Contact
Let's talk about your next project.
Send your specification or quantity table; our team will respond shortly.


